IA Advisory Committee Meeting 10.02.15

Update:  10/2/15 meeting was cancelled due to technical difficulties. Update narratives have been added to each sub-heading below for review by IA Advisory Committee.  

Next meeting:  TBD - Doodle Poll sent 10/2/15. 

Welcome & Roll Call

District

Member Name

 

District

Member Name

 

Butte-Glenn CCD

Rachel Wood

 

Los Angeles CCD

Olivia Alvarado

 

Cerritos CCD

Norma Rodriguez

 

Miracosta CCD

Jane Sparks

 

Chabot-Las Positas CCD

Dolly Balangitao

 

Mt. San Jacinto CCD

Jackie Alvarado-Padilla

 

Contra Costa CCD

Gloria Zarabozo

 

Peralta CCD

Thomas Torres-Gil

 

Contra Costa CCD

Susie Hansen

 

Santa Barbara CCD

Rosemary Santillan
Carola Smith (sitting in)

 

Contra Costa CCD

Diane Ahlborn

 

San Francisco CCD

Marylou Leyba

 

El Camino CCD

Lindsey Ludwig

 

San Mateo CCD

Diane Arguijo

 

Fullerton CCD

Pilar Ellis

 

San Mateo CCD

Henry Villareal

 

Grossmont-Cuyamaca

Wayne Branker

 

South Orange CCD

Christina Delgado

 

Grossmont-Cuyamaca

Mika Miller

 

South Orange CCD

Maria Lopez

 

Kern CCD

Michelle Pena

 

West Hills CCD

Daniel Tamayo

 

CCC Technology Center

Patty Donohue

 

 

 

 

 

 


Review August Advisory Meeting Minutes

In August, the IA Advisory members met for an introduction to the International Application development and release plan timeline. Committee general guidelines and objectives were reviewed, including the requirements set by the CCCApply Steering Committee - asking for final say on all specified development requirements (technical and functional) that require development funds to be allocated.  

 


Road Map Review


Road Map Update
 

10/2:  Changes to the road map are highlighted in blue below. 
 

Mandatory Accessibility Review Update

10/2:  In June 2015, OpenCCC (student account system) and the CCCApply standard application were audited by the State of California 508 Accessibility Commission.  The requirement was to address all issues identified within the audit and undergo an outside accessibility review by December. Addressing the issues in the audit, as well as ensuring that the BOG and International Applications also meet or exceed accessibility compliance, has been the primary focus of the CCC Technology Center since notified about the audit earlier this year. Developing an accessible application for students with disabilities has been our highest priority and we know that the payoff will be worth the delays. Unfortunately the accessibility review has been delayed - awaiting the contracts to be approved by the CCCCO.  

Due to the delay of the contract, the vendor has had to push us back on their schedule. Assuming we get the contracts executed within the next few weeks, the earliest the vendor can begin the review is November 4 - starting with OpenCCC and CCCApply Standard application.  The International application will be reviewed after Apply - which means our planned release in mid-October to colleges will be delayed until the International review is completed and we PASS.

Release Update:  Full Regression Testing > Release to Pilot Site - October 16

10/2:  When we found out about the delay of the accessibility review, we added another sprint to our development cycle. Sprint 86 (September 24 - October 13) will serve as a full regression test to ensure that all the accessibility development we've done, and all new International development work completed, is fully tested before release.  

Though we will not be able to release the International application to students until the accessibility review is completed, and we PASS across the board, we will still release the application to the Pilot environment (test site) on October 16.  This will happen even if by some miracle we are able to get reviewed sooner, and even if we DON'T PASS.  We will stick to our Plan B - release to Pilot for colleges to test and begin setting up their downloads/imports in preparation for eventual release to students.


Release to students is still dependent on PASS of accessibility review. 

IA Advisory Colleges may begin testing application in Pilot site - October 19

The International Application will be released to the Pilot site on Friday, October 16 starting at 5:00PM (it will take a few hours). Advisory will receive a follow-up announcement containing the access information and Administrator user accounts will be set up for Advisory members.  However, placeholder terms, majors and English proficiency tests will be included so that the application can be tested immediately. 

 

All College announcement - Release Update

10/2:  A release update will be placed on the CCCTechnology.info support site on Monday, October 5.  The high-level announcement will updt

 

Implementation Project Begins - November



Road Map - Key Dates

Oct 9 - Advisory Sprint Preview (TBD)  Cancelled due to conflict on Accessibility review date

Oct 16 - IA Data Dictionary and Implementation Documentation (IT Project docs) released to IA Advisory colleges

Oct 16 - Plan A)  Release to Pilot & Production;  Plan B)  Release to PILOT  Update: Cannot release the International Application to students until the Accessibility Review is complete and it has PASSED.

November 4 - 24 - Accessibility Review on the International Application scheduled (TBD)

Oct 17 - Sprint 87 begins TBD- IA development work resumes for March 2016 Update

Feb 21 - Development ends - Prep for March Annual Update

Mar 15 TBD - 2016-2017 CCCApply Annual Update (Apply, BOG, IA) 

Road Map (Monthly)

 
Sep2015OctNovDecJan2016FebMarOct 16Mar 2016Sep 4Sep 25Feb 16
Releases
Accessibility Review
Implementation
Communication
Development

Release to Pilot Site

TBD - IA Production Release

TPG Review

IA Project: Set Up Downloads

Announce IA Release Plan

Update Colleges on IA Status

Regression Testing

Remaining IA Requirements

 

Development Sprint Map

Breakdown of development work by sprint. Development work is completed in three week "sprints".

Pre-release development schedule: During the pre-release development process, all development will be reviewed internally.
Post-release development schedule: At the end of each post-release development sprint, the work will be reviewed and approved by stakeholders ( Steering Committee & sub-committee, eventually stakeholders will be all colleges using the International Application.)

Updated 10/2/15

21-Sep201528-Sep05-Oct12-Oct19-Oct26-Oct02-Nov09-NovOct 16 ReleaseSep 25
Sprints & Releases
Accessibility
IA Development

Sprint 84

Sprint 85

Sprint 86 - Regression Testing

TPG Accessibility Review: International

TPG Review APPLY & ACCOUNT

Unicon: Bugs & 508 Issues

Steering: Supplemental Questions & Rules

CCCTC: Reports & Other Administrator Changes

 

Sprint 85

  • Begin testing Apply & Account Accessibility requirements
  • Begin IA
  • Best case scenario: Finish Apply & Account TPG accessibility Review; begin IA TPG review

Sprint 86

  • 9/24 - 10/13: Full Regression Test Sprint

Sprint 87

  • 10/14 - 11/3: Accessibility Review (TBD)


 

High Priority Issues

    1. Gender Field & AB620
    2. English Proficiency Test Requirements
    3. Certificates in Degree Types
    4. SSN Re-design
      1. Approved by the CCCApply Steering Committee 
        1. New conditional checkbox question and downloadable data field (ssn_exception) to identify if the student who selects "ssn_no" is an international student or not. 
        2. If student selects "True - I am an international student and I do not have a Social Security Number or Taxpayer Identification Number." then the "SSN Encouragement" checkbox does not appear to students.
      2. Currently at top of the back-log for development.
        1. Dependent on TPG accessibility review completion
        2. Dependent on bugs completion

  1. Phone Number Formats
     
 


Supplemental Questions, Rules & Flags

Work-around Solution to Undeveloped Requirements

  • Call for sub-group to work on supplemental questions
  • Call for sub-group to work on Rules examples





 

Data Dictionary & Form Specification

Action Item: Need Revision Review

CONFIDENTIAL (CCCApply & IA Advisory Committees ONLY)


This document is an In-Progress Draft. This is not the final document; however, see the Change Log to see all changes made since the April 2015 International Application demo. 

 

 

Schedule Next Meeting

  • Application Review
  • Change Requests Pending:

 

 

Action Items:

  1. Set up access to the application for Advisory members
  2. Set up user accounts for each on Pilot
  3. Ensure there are a few test Terms and Majors open for test applications
  4. Send Olivia (everyone) the data fields and instructions on starting their data field mapping to SIS project.
  5. Set up demo for those Advisory members who haven't used the Administrator before - set up English Proficiency
  6. Write up all development changes made since the April 2015 International Demo
  7. Write up all pending change requests for prioritization
  8. Write up general requirements for review (phone number formats, etc.)
  9. Share a copy of the International App Data Dictionary to Advisory.
  10. NEW change request - Remove the Race/Ethnicity questions from the IA application. Gloria said she would take the lead and find out who mandates this field for International population. Take back to Steering committee for approval.

 

Review

Additional Requirements

 

  1. Evaluate accuracy of labels for labels like African-American or Mexican-American.  Issues of race ethnicity, Nationality, etc.  Probably a steering body issue.  Also controlled by IPEDS standards.
  2. Do we need the AB 620 questions on the personal info page?
  3. Ask first generation questions.  What are these?
  4. Ask for the student’s primary language.  completed 
  5. For transfer students allow input of the major. completed 

Additional Requirements

 

  1. Are there other English proficiency tests we want to include such as IELTS?  What are they?
  2. May need to edit/reduce the dropdown list for secondary/high school list options.  If just F1, may not need all of the options. (Complete). 

Additional Requirements

 

  1. There was a request is to have an agents dropdown list.  This would be difficult if not impossible to administer since it would vary from college to college.  Decided to use just input fields.