Warning |
---|
OpenCCCApply Infrastructure Migration Schedule Changes: Production Window - May 5, 2017 - 6:00PMUPDATE: PILOT Environment Migration - April 21, 2017 Both maintenance windows require short downtime. |
Zoom URL & Meeting ID
Date | April 26, 2017 |
Time | 12:00PM - 2:00PM |
Location | In Person - CACCRAO Conference |
Zoom URL | |
Meeting ID | |
Dial In | Dial: +1 646 558 8656 (US Toll) or +1 408 638 0968 (US Toll) Both numbers are Toll charge numbers. |
Agenda
TIME | DESCRIPTION | SPEAKER |
112:30PM00PM | Roll Call – Approval of Minutes from March 6, 2017 Meeting | Murguia / Pena |
112:40PM10PM | Update on Research Projects | Donohue |
212:15PM30PM | CCCApply News Recap of Conference season - Workshops | Donohue |
212:20PM45PM | Development & Roadmap Review
| Donohue |
31:10PM00PM | Donohue | |
31:30PM50PM | Next Meeting Dates | Murgia |
32:40ish00PM | Close Meeting | Murgia |
General Notes & Feedback (Change these to Action Items)
- Ensure that all future Agendas, ZOOM meeting URLs, and previous meeting minutes are sent out to Steering one week prior to next meeting.
- Link to minutes from previous meeting - one week prior to next meeting - giving committee members time to preview prior to meetings.
- Remind committee members to submit agenda items to the Chair to be added to the meeting agenda. How do we do this in an efficient way? Post a process doc and send with Minutes from previous meeting. Give members two weeks to submit an agenda item, so that the agenda (final) can be sent out to committee one week earler (as suggested above).
- Find out from Zoom if there is an 800 (Toll Free) number for Zoom (Patty knows there is, but find out which one it is and Highlight that on next meeting email.)
- Move all the CCCApply stats and adoption info to a page that can be referenced by all colleges and steering members and just keep on the Agenda / Minutes template - so this doesn't ahve to be a recurring agenda item, but anyone can visit those stats whenever they want.
- Look for other ways to streamline the meeting moving forward.
Also, committee should set some policies regarding members who miss more than 4 consecutive meetings in a row. There are several members that should be removed from the Committee if they miss one more meeting. Some kind of warning should be given or they will lose their seat.
- *Michelle Pena asked if Craig Hayward - current/previous Steering member from Irvine Valley, retired from IVC and is now with Kern County (Bakersfield?). She wants to have his seat moved to that college so he can continue to sit on committee.
ROSTER: Click Expand to see current roster.
Expand | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Anchor | ||||
---|---|---|---|---|
|
- Abandoned Applications - Show chart from report
- Submitted Applications - Time to Completion (Show chart)
- White Paper Update - No work done since last meeting - Release, vacations, workshop, etc. Jump start on summer project.
- Student Satisfaction Survey (Machine Learning project)
- SPAM Fraudulent Applications (Need data and examples from colleges)
- Google Analytics (Show data - discuss how to share back with colleges)
NOTE: No work has been done on the White Paper since early March due to vacations, the Annual Update Release, CCCApply Workshop, and other high priorities. Need to resume progress. Need volunteers.
CCCApply News
& StatsApplication Stats
5,083,651
The table below provides monthly totals on submitted applications vs. incoming support calls to the Help Desk Call Center.
NOTE: The Account Recovery enhancement released on September 30, 2016 (Release 5.5) is proving to be very effective. See the number of incoming support calls in October & November 2016, versus the months prior to the enhancement implementation. These numbers illustrate a decrease in the overall number of problem calls to the Help Desk by 64.65%.
2017 Submitted Applications
2017
Standard Application
BOGFW
IA
TOTALS
Incoming Calls to the Help Desk
Ratio
2016 Submitted Applications vs. Incoming Support Calls to Help Desk
2016
Standard Application
BOGFW
IA
TOTALS
Incoming Calls to the Help Desk
Ratio
Submitted Apps Per Week
Average Apps submitted per HOUR: 1,020
As of March 1, 2017
Standard Application
The following six colleges are still implementing CCCApply Standard Application:
- Feather River College (Deploying soon!)
- Palomar College
- Santa Monica College
- San Diego City College (Pushed back to 2018! PeopleSoft implementation)
- San Diego Mesa College
- San Diego Miramar College
International Application
The following colleges are currently implementing the CCCApply International Application:
- Irvine Valley College
- Saddleback College
- State Center District (Just started)
- Fresno City College
- Reedley College
- Clovis College
CCCApply News
2017 Annual Update - March 31, 2017
Release Notes Posted - See all feature enhancements and data fields.
AWS Move Confirmed
Development environments will be moved in mid-April, including Pilot (April 14)
Production environment will be moved on April 21 - 4 Hour Maintenance Window (after 6pm)
RFP for Software Development - Preparing to Award
CCCApply 3.0 Re-design
RFP closed on 2/24/17
- Three vendors submitted responses: Experis, Link Systems International, Unicon
Scoring completed - 2/27/17
Intent to Award - March 15 (Contracting period - add one month to that)
Begin gathering requirements with Awardee - April 30
CISOA Conference March 25 - 27, 2017
Proposal for a presentation on CCCApply at the CISOA Conferenc has been accepted.
Patty will present; seeking volunteers to co-present.
CACCRAO Conference April 23-27, 2017
CCCApply Presentations scheduled for CACCRAO Conference, April 23-27, 2017 (Please need a volunteer to accompany Patty)
Regarding our CACCRAO Issues Response _ still submitting comments back to Mike Q. from CACCRAO
Regarding residency for noncredit - Mike Q/CCCCO meeting with Legal next Friday - before they can publish an opinion they need to work through the implications to other legal areas, such as AB540
Hammering things out before direction can be confirmed.
Congratulations! OpenCCC Wins CENIC Innovation Award
Major kudos are in order! The California Community Colleges Technology Center has been awarded the CENIC 2017 Innovations in Networking Award for Educational Applications, in recognition of its groundbreaking work to develop a system-wide federated identity initiative - OpenCCC - for students across the CCC's 113 colleges. Cheers! to everyone at Unicon who contributed to this effort.
2017 Marketing Calendar
Conferences & Meetings- Patty is doing a presentation on CCCApply Annual Update & Roadmap. Looking for a co-presenter. Any volunteers?
- April 26 - Next In-Person CCCApply Steering Committee Meeting - Noon - 2:00PM (immediately following the closing of the CACCRAO Conference).
Pending Marketing Projects
- CCCApply Infographic
New Draft shared 3.07.17 based on the feedback provided by Steering from January 25 meeting.
View file | ||||
---|---|---|---|---|
|
2. CCCApply Whitepaper
3. Ways to support the growth of CCCApply.
Click on Links below for Roadmaps
Jan - March 31, 2017
AWS
Move
April - August 2017
September 2017
Spring 2018
Staff & Resources Needed
OpenCCC Account (Legacy)
Account UI Upgrade
Development:
Tomcat Upgrade
MyPath Integration
Account Integration w/MyPath
MyOpenCCC
MyPath integration Requirements
(RFP) Development
Release v1: TBD MyPath Integration
CCCApply Applications(Legacy)
BOG
IA
2017 Annual Update
March 31 - Prod Release
March 1 - PILOT Release
Post Release Activities (Tech Deb
Development/Tech Debt
Tomcat Upgrade (May)
Administrator 2.0 Integration
Release 6.1: September
Admin 2.0 Integration with Legacy CCCApply apps'
Release: 2018 Annual Update
EOL activities
*Tomcat Upgrade*
uPortal Upgrade
Maintenance Mode continues;
CCCApply Portlets
RFP In-Progress
Rewrite includes Apply, BOG, International Forms
NEW Development
Requirements & Development:
Universal Form Build
Development: Universal Form Build
Responsive design
Internationalize
CCCApply Administrator(Legacy)
2017 Annual Update
Development/Review
March 31 - Prod Release
March 1 - PILOT Release
Development:
Migration to Admin 2.0
Supp Questions module
(End of Life)
CCC Administrator 2.0 (New)
New Development
Documentation Drafts
Support & Training Plan
Migration Planning
Release V1 to Test for Accessibility Review - June 15, 2017
Release V1 to PILOT for College migration and testing - July 15,
Prod Launch September 15
Migration
Support documentation
Support training
(Split resource 50/59 with MyPath)*
*Per budget meeting with Lou 2/7/17
CCC Report Center Roadmap
Full Application Reports
End-of-Life (EOL)
EOL
TIBCO Jasper (AWS) Report Center
Research AWS Jaspersoft subscription models;
Draft requirements docs
Migration plan; continuous deployment across Dev-CI, Test, Pilot, Prod
Develop/Upgrade User Documentation
Launch Jasper Upgrade (Cloud)
Support & Training
Residency reports (feature enhancement)
Support & Training
CCCID Transfer API
College Integrations
Development: UI/UX Enhancements
College Integrations
InCommon project mgmt support; Vendor integration
Tech Projects - Ongoing
Spring 2017
Summer 2017
Fall 2017
Notes
Move Apply & Account to AWS
Migration plan - Infinity
DevOps & Sys Admin processes;
Tomcat Upgrade / uPortal Upgrade
Apply, Account, BOG, IA
Begin March 21
No concurrent dev work during upgrade
Infinity collaboration
Upgrade Jasper Report Center
Support;
More projects will be moving into the Report Center. Syed will pick up the additional dev work there.
Implement script to get CCCIDs into AD
Xap Import/ Migration Project
Accessibility Priorities
Implement Spam Filters
Implement Additional Administrator 2.0 Features
Begin integration of other projects
MDM will be next project integrated into Admin 2.0. Work with Jane on roadmap.
- Pilot Release: March 1, 2017
- Production Release: March 31, 2017
- Approved Change Requests
Release Highlights
AB 801 Homeless Youth
New questions & data fields
Update to Area B residency logic
Google Analytics added across all apps and OpenCCC
System-generated Email to Minimize Abandoned Applications
CDE SSID API - Data Exchange with CDE
California Colleges Guidance Initiative API - Data exchange with CCGI
2017-2018 BOG Fee Waiver Application
Support for AB 801
CCCCO-approved changes and Income table
- New skip logic added for special eligibilities
UPDATE 2/3/17: 60-Day Announcement went out to colleges.
Need to increase attendance.
Registration is at 224 TOTAL (between both days). Don't have a confirmed breakdown, but last breakdown showed:
2017 CCCApply Workshop Sessions Schedule
/wiki/spaces/PD/pages/155058183
Workshop Planning UPDATE 3/07/17:
- Sessions confirmed. See Schedule of Sessions and Presenters for details.
- Keynote speaker confirmed: Pam Walker!
- Rhonda Mohr has volunteered to lead the BOG Session if Tim Bonnel cannot do it. To be finalized soon.
- Bryan Miller, CCC Foundation, will lead the MyPath Student Services Portal session.
- The Accessibility Best Practices and Secure Data Handling Best Practices sessions will be separate sessions.
- General session and break-out rooms have been ordered; technology and wi-fi will be available.
- On-site parking, maps, and other signage will be handled by Sac City College
- The Sac City College President will kick off the day with an opening "Welcome" address at 9:00AM. This will be followed by Michelle doing general housekeeping, introduce the vendors/sponsors, and any other notes about the day.
Warning |
---|
Info |
See the new "/wiki/spaces/PD/pages/173725262" page, published on the CCCApply Public Documentation space, which includes monthly statistics of submitted applications, incoming calls to the Help Desk, and charts/graphs showing adoption and implementation. |
2017 Annual Update - March 31, 2017 - Retrospective
Release Notes Posted - See all feature enhancements and data fields.
Bug was identified in International App supplemental questions during the 6.0 release - This prevented release of updates to IA only.
Had to roll back IA changes and schedule a "Patch Fix Release" for Friday, April 7.
Release 6.0.1 (patch fix) was successful and "zero downtime" - meaning we didn't have to take the site off-line during the release.
This method of "zero downtime" is what we are striving to achieve moving forward on Amazon Web Services (AWS) - our new, secure infrastructure & hosting service.
Bug was identified in the new Homeless Youth checkboxes.
Release notes indicated these were "boolean" fields, but colleges reported these were breaking their downloads.
- Development team reviewed and changed format to "string" format.
Updated the data dictionaries with correct data format ("string" fields) and posted on Support Site.
Need Online Tutorials for some of the changes = working on tutorial and documentation for "System-generated Emails."
NOTICE! Upcoming Maintenance Windows: OpenCCCApply Infrastructure Migration to Amazon Web Services (AWS)
Migration of Development environments (Continuous Integration = CI; Testing = TEST) were moved successfully between April 7 - 14.
- Migration of Pilot site - rescheduled to April 21 (previously announced for April 14)
Production environment migration rescheduled to MAY 5 (previously announced for April 21) requires a 4 Hour Maintenance Window (after 6pm)
RFP for Software Development - Update
Working on contract for Project Management and reporting
Gathering requirements for CCCApply 3.0, BOG, and International changes
Scheduling a User Stories Summit for July 2017
Integration requirements for OpenCCC Account system - first system to be developed
CACCRAO Conference April 23-26, 2017
CCCApply Update scheduled as part of the afternoon general session on Tuesday, April 25
- Michael Q., Stephanie, Michelle? and Patty to deliver the update - Need final meeting to review presentation slides
- Suggestions for discussion points?
Info |
---|
Congratulations! OpenCCC Wins CENIC Innovation AwardMajor kudos are in order! The California Community Colleges Technology Center has been awarded the CENIC 2017 Innovations in Networking Award for Educational Applications, in recognition of its groundbreaking work to develop a system-wide federated identity initiative - OpenCCC - for students across the CCC's 113 colleges. Cheers! to everyone at Unicon who contributed to this effort. |
Roadmap & Development
All OpenCCCApply Products
(See Other Priority Projects table below)
Click on Links below for Roadmaps | Jan - March 31, 2017 | AWS | April - August 2017 | September 2017 | Spring 2018 | Staff & Resources Needed |
---|---|---|---|---|---|---|
OpenCCC Account (Legacy) | 2017 Annual Update - Release Notes Account UI Upgrade | Yes | Development | Release 6.1: September 29 Account Integration w/MyPath | Release: 2018 Annual Update | Tomcat 8 Upgrade & uPortal Update |
MyOpenCCC | Planning User Stories: | n/a | (RFP) Development Stories for MyPath Integration | Release v1: TBD MyPath Integration | Release v2: TBD | |
CCCApply Applications (Legacy) | 2017 Annual Update Post Release Activities (Tech Debt) | Yes | Development/Tech Debt | Release 6.1: September 29 | Release: 2018 Annual Update EOL activities | *Tomcat Upgrade* Maintenance Mode continues; |
CCCApply Portlets | RFP In-Progress | n/a | NEW Development Universal Form Build Engine | NEW Development Universal Form Build Engine | Release v1 TBD | |
CCCApply Administrator(Legacy) | 2017 Annual Update March 31 - Prod Release | Yes | Development: | (End of Life) | (End of Life) | |
CCC Administrator 2.0 (New) | New Development | n/a | Release V1 to Test for Accessibility Review - July 15, 2017 Release V1 to PILOT for College migration and testing - August 1 | Prod Launch Sept 29 Migration | Release v2 | *Need Technical / Marcomm writier *Per budget meeting with Lou 2/7/17 |
CCC Report Center Roadmap | New Full Application Reports | Yes | End-of-Life (EOL) | EOL | EOL | |
TIBCO Jasper (AWS) Report Center | Research AWS Jaspersoft subscription models; Draft requirements docs | YES | Migration plan; continuous deployment across Dev-CI, Test, Pilot, Prod | Launch Jasper Upgrade (Cloud) Residency reports (feature enhancement) | Support & Training | Confirmation on Upgrade; plan EOL for original RC |
CCCID Transfer API | College Integrations | College Integrations | College Integrations | InCommon project mgmt support; Vendor integration |
Tech Projects - Ongoing
Spring 2017 | Summer 2017 | Fall 2017 | Notes | |
---|---|---|---|---|
Move Apply & Account to AWS | Plan, Test, Move, Test | Architectural Configurations | First release on AWS; deployment planning | Confirmed timeline; Migration plan - Infinity DevOps & Sys Admin processes; |
Tomcat Upgrade / uPortal Upgrade | HIGH PRIORITY: Begin March 21 | Apply Dev/Ops resource: Josh = 2-3 sprints No concurrent dev work during upgrade Infinity collaboration | ||
Upgrade Jasper Report Center | Plan for move to AWS | Deployment management | Launch new AWS version; Documentation; Support; | More projects will be moving into the Report Center. Syed will pick up the additional dev work there. |
CCCID Transfer Processes (Report Center & API) | 2017 Annual Update | API data exchange Implement script to get CCCIDs into AD | Requirements for Project Glue data exchange process | Need project management support - Apply Dev Team |
Xap Import/ Migration Project | NEED | NEED | Need contract resource to finish Xap import for BOG and IA | Need internal or contract resource for this project |
Accessibility Priorities | ADMINISTRATOR 2.0 | Per Sean, Internal Review | ||
Implement Spam Filters | Development | Release: September 2017 | Apply Dev Team | |
Implement Additional Administrator 2.0 Features | Focused on CCCApply features | Release CCCApply features, Begin integration of other projects | Possibly before fall - Wes will have bandwidth to start incorporating Glue/Assess/CE into 2.0 | 2/7/17 - Per budget meeting with Lou: MDM will be next project integrated into Admin 2.0. Work with Jane on roadmap. |
Anchor | ||||
---|---|---|---|---|
|
New Change Requests - Pending review during March 7 meeting.
Comments:
There's a bug in the Country Codes (No listing for United Kingdom - have Tyler double check the ISO 3166. Ensure the country codes are listed within the data dictionary or reference in a link in an Appendix.
Deferred the Preferred Name issue. Work on proposed language changes and decide at April meeting.
Deferred the "Special Character restrictions in the Username field until AWS is consulted and based on what they can provide us, determine if we make a technical change or requirements change to restrict characters other than @ and period from the Username field.
Deferred the Previous Name issue and redesign placement of the "I have no first name...et al. to adjacent to the input field. (However, based on responsive design UI, this may be moot point, the responsive design will resize the page anyway. Perhaps a better design experience is needed altogether.).
Deferred the International App changes to the IA sub-committee. These need to be reviewed prior to code freeze for the September release.
Title IX Survey data should be incorporated in to the Report Center (Phase I) then build the Title IX survey questions into an "Opt in" question block in the new version of CCCApply.
Add rest of notes here.
Anchor | ||||
---|---|---|---|---|
|
- Project Site updated with revised Meeting Information
- Steering has been notified by email(s) announcing schedule
Date & Time | Description | Location | Notes & Action Items |
---|---|---|---|
March 7, 2017 | Regular Meeting | ONLINE | Changed in-person meeting to online meeting in February. Also, we will all be gathering at the CCCApply Workshop on April 12, so that can suffice for in-person meeting until April 26. This will be most cost-effective for all.
|
April 12, 2017 8:00AM - 4:30PM | 2017 CCCApply Annual Workshop | Sac City College | |
April 13, 2017 8:00AM - 4:30PM | 2017 eTranscript CA Annual Workshop | Sac City College | |
April 12, 2017 6:00PM - 8:00PM | Steering Appreciation Dinner -evening of the CCCApply Workshop | Ten22 Old Sacramento Restaurant |
|
April 26, 2017 12:00PM - 2:00PM | Special In-Person Meeting | 2017 CACCRAO Conference Double Tree Hotel, San Diego, CA |
|
July 19, 2017 | Regular Meeting - In-Person | Where? Need Location |
|
Fall 2017 | Need to plan next six months | Where? |
|
Approval Poll Table
Expand | ||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|