The following college districts' circuits are currently scheduled for upgrade to 10GB or new 1GB circuits for center locations. This project plan is not static and may change depending on how the circuit priorities change as impacted by construction, circuit outage and diversity issues, new buildings and/or center locations, technology upgrades, etc. For more information on CENIC and the Broadband Infrastructure Upgrade project, check out the CENIC Public Documentation page.


*Note, all circuit evaluations were reprioritized to frontload as many as possible into July-December 2022 timeframe as the routers ordered for FY22/23 arrived 6 months sooner than originally estimated.

July 2022

  • Cabrillo CCD xx

    • Watsonville Center 1GB

  • Kern CCD xx (SWAP PRIOR YR)

    • Cerro Coso College 2x 10GB

  • Napa Valley CCD xx

    • Upper Valley Center 2x 1GB

  • Palo Verde CCD xx (NEW - on Map, Not on Priority)

    • Needles Center 2x 1GB

  • Sonoma CCD xx (NEW)

    • Southwest Center 2x 1GB

  • Victor Valley CCD xx (HHC NEW)

    • VVC Regional Public Safety Training Center 1GB

    • Hesperia HS Center 1GB

  • West Valley-Mission CCD xx

    • Mission College-West Valley Mission College 10GB

August 2023

  • Foothill-De Anza CCD xx

    • Sunnyvale (Middlefield) Education Center 2x 1GB

  • Hartnell CCD xx (CVC NEW)

    • Alisal Campus 2x 1GB

    • Castroville Center 1GB

    • King City Center 1GB

    • Soledad Campus 1GB

  • Imperial CCD xx

    • Imperial Valley College 2x 10GB

  • Mendocino CCD xx

    • North County Center 2x 1GB

  • Mt San Jacinto CCD xx

    • Temecula Valley Campus 1GB

  • Shasta-Tehama-Trinity Joint CCD xx (NEW)

    • Shasta Community Leadership Center 2x 1GB

  • South Orange County CCD xx (HHBS NEW)

    • Hoag Broadcast Site 1GB (canceled)

    • Laguna Woods Campus 1GB (canceled)

    • SOCCCD Workday Training Facility 10GB (diversity configuration)

    • SOCCCD Advanced Technology Ed Park 2x 10GB (diversity configuration)

  • Ventura County CCD xx (OX-VC NEW missed config)

    • Oxnard College 10GB

    • Ventura College 10GB

    • Ventura County CCD Office 10GB (diversity configuration)

  • Yosemite CCD xx (MJCE NEW)

    • Modesto Junior College - West 10GB

    • Columbia College 10GB

    • Modesto Junior College - East 10GB (duplicate canceled)

September 2023

  • Kern CCD xx (SWAP)

    • Eastern Sierra Center - Bishop 1GB

  • Redwoods CCD xx

    • College of the Redwoods 2x 10GB

    • City of Hoopa 2x 1GB

    • Del Norte Center 1GB

      • Hoopa rescheduled to 23/24, awaiting fiber build

  • San Jose Evergreen CCD xx

    • San Jose City College 10GB

    • Milpitas College Extension Center 2x 1GB

October 2023

  • No Circuit Evaluations

November 2023

  • Allan Hancock Joint CCD xx (SWAP)

    • Lompoc Valley Center 2x 1GB

  • Gavilan CCD xx (SB SWAP)

    • Coyote Valley Education Center 2x 1GB (1 canceled)

    • Hollister Campus 2x 1GB

    • San Benito Campus 2x 1GB

    • San Martin Campus 2x 1GB

      • San Benito rescheduled in 23/24, when site is completed

  • San Luis Obispo CCD xx (NEW)

    • North County Center 10GB (diversity configuration)

  • Siskiyous CCD xx (23/24 REPRIOR)

    • Yreka Campus 2x 1GB

      • 1 scheduled for re-evaluation in 23/24, due to No Bid

December 2023

  • No Circuit Evaluations

January 2023

  • No Circuit Evaluations

February 2023

  • Hartnell CCD (CV NEW, AC dupes in 23/24)

    • Castroville Campus 1GB secondary

    • King City Center 1GB secondary

    • Soledad Campus 1GB secondary

    • Alisal Campus 2x 1GB

  • Santa Monica CCD xx (SWAP CCDO)

    • Malibu Campus 2x 10GB (diversity configuration)

March 2023

  • Foothill-De Anza CCD

    • Foothill College 10GB (Rebid for Diversity)

  • North Orange County CCD xx (NEW)

    • North Orange County CCD Office 10GB (diversity configuration)

  • Ventura CCD xx (NEW)

    • Ventura East Campus 2x 1GB or 10GB (diversity configuration)

April 2024

  • Barstow CCD xx (23/24 REPRIOR + NEW)

    • Barstow College 2x 10GB

    • Fort Irwin Campus 2x 1GB

  • Mendocino CCD xx (NEW)

    • Covelo HS Center 1GB

      • rescheduled to 23/24 when center construction complete

  • San Mateo CCD xx (NEW)

    • Half Moon Bay Center 2x 1GB

    • Menlo Park Campus 2x 1GB

May 2024

  • Palo Verde CCD xx (NEW)

    • Child Development Center - Blythe 1GB

  • State Center CCD xx (Some NEW, need to figure #)

    • xx all Circuits

June 2024

  • Merced CCD xx (23/24 REPRIOR)

    • Los Banos Center 2x 1GB

    • Los Banos CTE Lab 1GB

    • Merced Business Resource Center 2x 1GB

      • rescheduled 2 secondary circuits to 23/24, need firewalls

  • North Orange County CCD xx (NEW)

    • Cypress College 10GB (replacement diversity)

    • Fullerton College 10GB (replacement diversity)


Quarterly Progress on Circuit Installations

FY22/23 Circuits

Circuits Reprioritized and/or Added to Original Plan1

Planned Prioritized Circuits2

Circuits Implemented, In Production to Date

Planned Circuits Ordered, in Process of Implementation3

Planned Circuits Pending Review and/or Order

Planned Circuits Canceled4

Planned Circuits Rescheduled for Future Year5

Quarter 1: July - September 2022

14

58

0

17

37

0

4

Quarter 2: October - December 2022

4 or 7??

62

0

38

22

2

3

Quarter 3: January - March 2023

4

55

3

38

13

0

0

Quarter 4: April - June 2023

17

72

6

55

10

1

0

1 Reprioritized circuits have been added to the original Planned Prioritized Circuits totals.

2 Includes all reprioritized and new circuit requests as noted above.

3 Implementations typically take 3-9 months or longer in some cases depending on project needs and are largely dependent on collaboration between the telecommunications carrier(s), CENIC’s PMs and engineers, sometimes local government (permits), and the college/district purchasing and installing or connecting equipment, then migrating and testing circuits. CCCTC and CENIC PMs regularly review circuits in this status and reach out to the carriers and colleges/districts as needed to keep things moving.

4 Circuit cancellations are based on college/district requests or due to “No Bid” from telecommunications carriers. Note that these are not deducted from the “Planned Prioritized Circuit” totals above and are not cumulative for each quarter, only the number of circuits canceled within a specific quarter are counted.

5 Circuits rescheduled for the following fiscal year at the colleges' request AND deducted from the “Planned Prioritized Circuit” totals above.


For Questions or More Information Contact:

CCC Technology Center:

Cindy McCartney, Project Manager CCC Broadband Infrastructure Upgrade cmccartney@ccctechcenter.org

CENIC:

Ken Roberts, Project Manager CCC Segment kroberts@cenic.org

To Report Network Routing or Technical Issues:

CENIC NOC (available 24/7):

Email: noc@cenic.org

Phone: 714-220-3494