Proxy Integration Checklist - Internal Use

When a college is ready to integrate with the proxy the following internal and external steps must be completed:

Proxy On-boarding: Clone CIP-9 JIRA ticket template when creating a new College Proxy ticket. Make sure all sub-tasks are cloned with ticket.
StepWho?Description
1CollegeCollege has installed or upgraded Shibboleth v3 (or equivalent supported IdP)
2CollegeCollege has joined InCommon Federation Note: This is not required but is highly suggested
3CCC PMPM provides college with all required SSO & Proxy IdP documentation and checklists*
4CCC PMCreates a CIP Proxy JIRA Ticket (Clone CIP-9 with sub-tasks and revise title with college name & MIS code). PM or PO updates the Master SSO Proxy Table with JIRA ticket link. 
5CollegeCollege configures Pilot IdP per instructions provided**
6CollegeCollege adds EntityID to metadata
7CollegeCollege sends InCommon metadata to PM or Unicon
8CCC PMAttaches metadata to JIRA sub-task and assigns sub-task to Geneva P.
9UniconAdds metadata to Pilot environment for college testing. Notifies college to test.
10CollegeCollege tests Proxy in Pilot and sends feedback to PM or Unicon
11UniconUnicon moves metadata to Production for college testing
12CollegeCollege configures Production IdP per instructions provided**
13CollegeCollege confirms Production Proxy works
14CCC PMWorks with college to integrate with Canvas
15CCC PMWorks with college to integrate with Hobsons
16CCC PMWorks with college to integrate with EMSI
17CCC PMWorks with college to integrate with CCCApply V3

*Documentation and checklists for SSO Initiative.
**Documentation and checklists for Proxy IdP Configuration based on College IdP.Â