...
Tip |
---|
Proxy On-boarding: Clone CIP-9 JIRA ticket template when creating a new College Proxy ticket. Make sure all sub-tasks are cloned with ticket. |
Document / Link | 1 | College | College has installed or upgraded Shibboleth v3 (or equivalent supported IdP) |
taken steps to join has joined InCommon Federation |
(Not required at time of Proxy integration, This is not required but is highly |
recommended.) | CCC College college with all required |
CCC IDP integration IdP documentation and checklists* |
|
4 | CCC PM | Creates a CIP Proxy JIRA Ticket (Clone CIP-9 with sub-tasks and revise title with college name & MIS code). PM or PO updates the Master SSO Proxy Table with JIRA ticket link. |
|
5 | College | College configures Pilot IdP per instructions provided** |
| 6 | College | College adds EntityID to metadata |
| 7 | College | College sends InCommon metadata to PM or Unicon |
| 8 | CCC PM | Attaches metadata to JIRA sub-task and assigns sub-task to Geneva P. |
| 9 | Unicon | Adds metadata to Pilot environment for college testing. Notifies college to test. |
|
10 | College | College tests Proxy in Pilot and sends feedback to PM or Unicon |
|
11 | Unicon | Unicon moves metadata to Production for college testing |
| 12 | College | College configures Production IdP per instructions provided** |
|
13 | College | College confirms Production Proxy works |
|
14 | CCC PM | Works with college to integrate with Canvas |
| 15 | CCC PM | Works with college to integrate with Hobsons |
| 16 | CCC PM | Works with college to integrate with EMSI |
| 17 | CCC PM | Works with college to integrate with CCCApply V3 |
*Documentation and checklists for SSO Initiative.
**Documentation and checklists for Proxy IdP Configuration based on College IdP.