...
Tip |
---|
Proxy On-boarding: Clone CIP-9 JIRA ticket template when creating a new College Proxy ticket. Make sure all sub-tasks are cloned with ticket. |
Step | Who? | Description | Document / Link |
---|
1 | College | College has installed or upgraded Shibboleth v3 (or equivalent supported IdP) | |
2 | College | College |
has joined taken steps to join InCommon Federation (Note: |
This is not required Not required at time of Proxy integration, but is highly |
suggested PMPM college College with all required CCC SSO & IDP Proxy |
IdP integration documentation and checklists* | |
4 | CCC |
PM | Creates a CIP Proxy JIRA Ticket (Clone CIP-9 with sub-tasks and revise title with college name & MIS code). PM |
or PO updates the Master SSO Proxy Table with JIRA ticket link. | |
5 | College | College configures Pilot IdP per instructions provided** | |
6 | College | College adds EntityID to metadata | |
7 | College | College sends InCommon metadata to PM or Unicon | |
8 | CCC |
PM | Attaches metadata to JIRA sub-task and assigns sub-task to Geneva P. | |
9 | Unicon | Adds metadata to Pilot environment for college testing. Notifies college to test. | |
10 | College | College tests Proxy in Pilot and sends feedback to PM or Unicon | |
11 | Unicon | Unicon moves metadata to Production for college testing | |
12 | College | College configures Production IdP per instructions provided** | |
13 | College | College confirms Production Proxy works | |
14 | CCC |
PM | Works with college to integrate with Canvas | |
15 | CCC |
PM | Works with college to integrate with Hobsons | |
16 | CCC |
PM | Works with college to integrate with EMSI | |
17 | CCC |
PM | Works with college to integrate with CCCApply V3 | |
*Documentation and checklists for SSO Initiative.
**Documentation and checklists for Proxy IdP Configuration based on College IdP.